San Bernardino Valley Municipal Water District
Readings For 7/4/2008 at 8:16:24 at
GREENSPOT PIPELINE      1.0 CFS
*** UNDER CONSTRUCTION ***  
SA River Total Flow 18.2 CFS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               
Greenspot Meter Station 398  
GS Forebay Level 2314.69 FEET
GS Turbidity 0.0 NTU
GS Pressure 105.4 PSI
BVHL Inlet Forebay Level 2314.52 FEET
GS Forebay Level ( Spill Pt.2314.75' ) 2314.75 FEET      FLOW TOTALIZER        DAILY FLOW TOTAL
GS Meter Station Flow 0.0 CFS 89184.3 ACFT 0.0 ACFT
SAR #3 Pnstk Flow 11.7 CFS 278140.2 ACFT 0.0 ACFT
BVHL Inlet Prop Flow 6.9 CFS 12123.2 ACFT 0.0 ACFT
GS Forebay Spill Flow 0.0 CFS 806.366 ACFT
Time Date
SBVWCD - Parshall Flume - Main Canal 829 704
Battery Voltage 12.20 Vdc
Station Level 0.08 Ft      FLOW TOTALIZER        DAILY FLOW TOTAL      YSTRDYFLOWTOTAL
Station Flow 1.5 CFS 17625.1 ACFT   1.1 ACFT 0.9 ACFT
     
SAR Water Recharged Under Temp Permit 21212   7225.1 ACFT
Bear Valley Connector   51
BVC Pressure 70.1 PSI      FLOW TOTALIZER      DAILY FLOW TOTAL
BVC Flow 0.0 CFS 9516.68 ACFT 0.00 ACFT
SBCFCD Flow 0.9 CFS 5914.34 ACFT 0.00 ACFT
BVHL Prop Flow 6.0 CFS 36585.16 ACFT 0.00 ACFT
         
Newport Turnout   819
Battery Voltage 12.35 Vdc
Rug3 Temperature 81.99 F      FLOW TOTALIZER        DAILY FLOW TOTAL
Station Flow 0.0 CFS 62.0 ACFT   0.00 ACFT
         
         
Zanja Tate Meter Station 816 Raw Data up pressure
Upstream Pressure 81.6 PSI 2228
Downstream Pressure 78.4 PSI      FLOW TOTALIZER        DAILY FLOW TOTAL
Crafton Unger Flow 0.0 CFS 2519.57 ACFT 0.00 ACFT
M/C Spreading Flow 0.0 CFS 1666.89 ACFT 0.00 ACFT
         
       
 Crafton Water Co. Reservoir 1958    
Battery Voltage 12.3 Vdc    
Level     (  0.0 - 21.3 FEET ) 15.3 FEET    
Tate Pump Station   816
Suction Pressure 17.1 PSI
Discharge Pressure 41.8 PSI
Unit #1 (  6 CFS Pump @ 1800 RPM ) 0.0 % Speed
Unit #2 (  6 CFS Pump @ 1800 RPM ) 0.0 % Speed
Unit #3 (  10 CFS Pump @ 1800 RPM ) 0.0 % Speed
Unit #4 (  10 CFS Pump @ 1800 RPM ) 0.0 % Speed      FLOW TOTALIZER        DAILY FLOW TOTAL
Station Hi Flow 0.0 CFS 1250.24 ACFT 0.0 ACFT
Station Low Flow 0.0 CFS          
East Weir Flow 0.0 CFS 1.42 ACFT 0.0 ACFT
Bear Valley Boullioun Flow 0.0 CFS 2781.59 ACFT 0.0 ACFT
Crafton Boullioun Flow 0.0 CFS 0.59 ACFT 0.0 ACFT