| San Bernardino Valley Municipal Water District | |||||||||
| Readings For | 7/4/2008 | at | 8:16:24 | ||||||
| EAST BRANCH EXTENSION PIPELINE | |||||||||
| *** UNDER CONSTRUCTION *** | |||||||||
| Crafton Hills Reservoir | 4 | Capacity - ACFT | |||||||
| Maximum Level | 2925.0 | FT MSL | 118 | ||||||
| Actual Level | 2918.68 | FT MSL | 85.73 | ||||||
| Minimum Level | 2905.0 | FT MSL | 34.7 | ||||||
| Crafton Hills Tank | 43265 | Capacity - ACFT | |||||||
| Maximum Level ( Spill ) | 2312.0 | FT MSL | 9.18 | ||||||
| Actual Level | 2311.00 | FT MSL | 8.81 | ||||||
| Minimum Level | 2287.0 | FT MSL | 0.0 | ||||||
| Greenspot Pump Station | 1509 | ||||||||
| Unit #1 ( 10 CFS Pump @ 1800 RPM ) | 0.0 | % Speed | |||||||
| Unit #2 ( 10 CFS Pump @ 1800 RPM ) | 98.0 | % Speed | |||||||
| Unit #3 ( 10 CFS Pump @ 1800 RPM ) | 87.9 | % Speed | |||||||
| Unit #4 ( 20 CFS Pump @ 1200 RPM ) | 98.0 | % Speed | DAILY FLOW TOTAL | ||||||
| Suction Pressure | 36.1 | PSI | |||||||
| Discharge Pressure | 212.1 | PSI | FLOW TOTALIZER | ||||||
| Station Flow | 40.6 | CFS | 12169.9 | ACFT | 0.00 | ||||
| Morton Canyon V-V | |||||||||
| Station Pressure | 169.2 | PSI | |||||||
| Crafton Hills Pump Station | |||||||||
| Unit #1 ( 10 CFS Pump ) | RUNNING | STATUS | |||||||
| Unit #2 ( 10 CFS Pump ) | STOPPED | STATUS | |||||||
| Unit #3 ( 20 CFS Pump ) | RUNNING | STATUS | |||||||
| Suction Pressure | 15.7 | PSI | |||||||
| Discharge Pressure | 277.7 | PSI | FLOW TOTALIZER | ||||||
| Station Flow | 40.3 | CFS | 21760.7 | ACFT | |||||
| Carter Street Valve Complex | |||||||||
| Station Pressure | 51.6 | PSI | |||||||
| Yucaipa Station Pressure | 50.0 | PSI | FLOW TOTALIZER | ||||||
| Station Flow | 16.6 | CFS | 4307.1 | ACFT | |||||
| Yucaipa T/O - #1 | 1629 | ||||||||
| CHR Level (Calc.) | 2920.7 | Ft MSL | |||||||
| Water Temp. | XX.X | F | |||||||
| YVWD Crystal Creek TP - Tank Level (0-17Ft) | 16.3 | Feet | |||||||
| System Pressure | 59.9 | PSI | |||||||
| Station Inlet Pressure | 59.2 | PSI | 47.7 | ||||||
| Station Outlet Pressure | 39.7 | PSI | FLOW TOTALIZER | ||||||
| Station Flow | 13.9 | CFS | 7327.59 | ACFT | |||||
| YVWD Crystal Creek TP - Effluent Flow | 10.4 | CFS | |||||||
| Yucaipa Irrigation Flow(C423) | 0.0 | CFS | 1872.442 | ACFT | |||||
| Garden Air Creek Meter Station | |||||||||
| FLOW TOTALIZER | |||||||||
| Station Flow | 0.0 | CFS | 1815.5 | ACFT | |||||
| Cherry Valley Pump Station | |||||||||
| Unit #2 ( 8 CFS Pump @ 1800 RPM ) | 0 | RPM | |||||||
| Unit #3 ( 8 CFS Pump @ 1800 RPM ) | 0 | RPM | |||||||
| Suction Pressure | 73.7 | PSI | |||||||
| Discharge Pressure | 75.7 | PSI | FLOW TOTALIZER | ||||||
| Station Flow | 0.0 | CFS | 5414.4 | ACFT | |||||
| Little San Gorgonio Creek | |||||||||
| LSG Probe Level | 0.15 | FT | FLOW TOTALIZER | ||||||
| Station Flow | 0.00 | CFS | 3407.8 | ACFT | |||||