San Bernardino Valley Municipal Water District
Readings For 7/4/2008 at 8:16:24
*** UNDER CONSTRUCTION ***  
        
 San Bernardino Ave Well 818
Station Pressure 0.0 PSI
System Pressure 0.0 PSI      FLOW TOTALIZER      DAILY FLOW TOTAL
Redlands Flow 0.0 CFS 584.37 ACFT   ACFT
Bear Valley Flow 0.0 CFS 0.701 ACFT 0.0 ACFT
 Crafton Water Co. Reservoir 1958
Battery Voltage 12.3 Vdc
Level     (  0.0 - 21.3 FEET ) 15.3 FEET
DeWatering Well #1 0
Upper Level 0.0 FT
Lower Level 0.0 FT
Upper Conductivity 0.0 mS/cm
Lower Conductivity 0.0 mS/cm  
Discharge Conductivity 0.0 mS/cm
VFD Speed 0.0 %      FLOW TOTALIZER      DAILY FLOW TOTAL
Station Flow 0.0 GPM 0.00 ACFT   ACFT
DeWatering Well #2 0
Upper Level 0.0 FT
Lower Level 0.0 FT
Upper Conductivity 0.0 mS/cm
Lower Conductivity 0.0 mS/cm
Discharge Conductivity 0.0 mS/cm
VFD Speed 0.0 %      FLOW TOTALIZER      DAILY FLOW TOTAL
Station Flow 0.0 GPM 0.00 ACFT   ACFT
Redlands Pump Station 820
1EveryTenSecondTimer 43 10 SecTimr
Redlands Tank Level 18.54 FT
     
Redlands Tank CL2 0.01 PPM
Discharge Pressure 189.5 PSI
Discharge CL2 0.00 PPM
     
Clear Well Water Level 28.00 FT      FLOW TOTALIZER
Inlet Station Flow 0.0 CFS 87.0 ACFT
Pump #1 Speed 0.0 %
Pump #2 Speed 0.0 %
Pump #3 Speed 0.0 %
     
MWD - Opal Ave. TI 815
Station Pressure 62.88 PSI
System Pressure 61.78 PSI
           FLOW TOTALIZER
Station Flow 0.0 CFS   ACFT
Station Hourly Data - Rug5  
Time (Hourly data Logged) 959 HrMn
Level 27.19 FT
Volume 1790.9 CUFT
Flow 8.5 GPM